Honeywell HM509 Owners Guide - Page 18
and DIP 4 OFF and wire R, C
View all Honeywell HM509 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
Installation Guide Wiring Follow this diagram for a system with the VisionPRO IAQTM with operation dependent on HVAC power (humidification and fan call by thermostat). EQUIPMENT INTERFACE MODULE (EIM) D-1 R-2 1 C-3 2 3 B VISIONPRO IAQ C R HVAC POWER MASTER RC 24V RH 24V HUM H1 HUM U M2 C GT RECOMMENDED AIR FLOW SWITCH D1 H M2 R (AFS) V1 RT N T2 GF EXT TrueSTEAM - INTERNAL CONV. HP W1 O/B W2 AUX W3 AUX2 Y Y Y2 Y2 G G FAN FURNACE BOARD C HEAT 1 RELAY HEAT 2 RELAY HEAT 3 RELAY COOL 1 RELAY COOL 2 RELAY G FAN RELAY M24761 B Set VisionPRO IAQTM ISU parameter 374 to 1. This allows the thermostat to call for fan at the same time as it calls for humidification. If AFS is not used, set DIP 4 ON and wire HUM terminals only. If AFS is used, set DIP 5 ON and DIP 4 OFF and wire R, C, and Hum terminals. Follow this diagram if using a blower fan dedicated to the TrueSTEAM (a fan separate from the HVAC equipment, as in hydronic or cooling-only applications). HVAC RC AT120 120 VAC R8222 RED RECOMMENDED AIR FLOW SWITCH (AFS) L1 120 VAC L2 BLACK 24V 24V HUM HUM C GT R RT GF EXT HVAC POWER MASTER TrueSTEAM - INTERNAL If AFS is used, ensure DIP 5 is in ON position. MECHANICAL HUMIDISTAT HUM HUM HAC HAC HUMIDISTAT HUM HUM HAC HAC M24760 Remove Factory installed jumper (R/RT) 69-2036EFS-07 16