Intel ISP4400 Quick Start Guide - Page 20
Center-mount Kit
View all Intel ISP4400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Center-mount Kit WARNING AVOID INJURY: To avoid personal injury when unpacking the server, use only a mechanical assist unit to lift it off the shipping pallet. The minimum server configuration weighs 26 kg (57 lbs); the maximum weighs 40 kg (88 lbs). Do not attempt to lift or move the server by the handles on the power supplies. Use only a hand-truck or other mechanical assist unit to move the server from one location to another. To mount the SRKA4 server system on a center-mount configuration, install the center-mount kit as directed in this section. The center-mount kit contains four EIA brackets, and several screws, nuts, and bolts. Screws, nuts, and bolts are provided for securing the brackets to the chassis. However, you must supply the screws that secure the brackets to the rack. There are two sets of EIA rail brackets. One set is labeled FL/RR. These brackets are attached to the front of the slide assembly. The other set is labeled FR/RL. These brackets are attached to the back of the slide assembly. WARNING ANCHOR THE EQUIPMENT RACK: To prevent the equipment rack from falling over, you must anchor the equipment rack to an unmovable support. The anchors must be able to withstand a force of up to 113 kg (250 lbs). You must also consider the weight of any other device installed in the rack. 20 Quick Start Guide