Lenovo Y500 Hardware Maintenance Manual - Page 56
Removal steps of system board, M2.5 × 4 mm, flat-head, nylok-coated 2
View all Lenovo Y500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 56 highlights
Lenovo Y400/Y500 Hardware Maintenance Manual Figure 10. Removal steps of system board Y400: Remove screws a . Detach camera connector in the direction shown by arrow b , unplug DC-IN connector in the direction shown by arrow c , LCD connector in the direction shown by arrow d . a Y400 a b d c Step Screw (quantity) a M2.5 × 4 mm, flat-head, nylok-coated (2) Color Torque Black 2.0 ~ 2.5 kgfcm 52
Lenovo Y400/Y500 Hardware Maintenance Manual
52
Figure 10. Removal steps of system board
Y400:
Remove screws
. Detach camera connector in the direction shown by
arrow
, unplug DC-IN connector in the direction shown by arrow
, LCD
connector in the direction shown by arrow
.
Step
Screw (quantity)
Color
Torque
M2.5 × 4 mm, flat-head, nylok-coated (2)
Black
2.0 ~ 2.5 kgfcm
a
b
c
d
Y400
b
a
a
c
d
a