LiftMaster HDSL24UL Installation Manual - English - Page 45
SOLAR PANELS, Step 6 Solar Panel(s), Solar Application Requirements
View all LiftMaster HDSL24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
SOLAR PANELS Step 6 Solar Panel(s) SOLAR PANELS ARE NOT PROVIDED. SEE ACCESSORIES NOTE: The use of photoelectric sensor heaters (models LMRRUL and LMTBUL) is NOT recommended in solar applications. Solar Application Requirements • A minimum of two 10W solar panels in series (Model SP10W12V). • A maximum of six 10W solar panels (Model SP10W12V). • A heater cannot be used with a solar application. Solar Zones Solar panel recommendations are based upon the average solar radiation and the temperature effects on batteries in the given zones as shown on the map below. Local geography and weather conditions may require additional solar panels. Solar powered gate operator installations are not supported in northern climates due to cold weather and a reduced number of hours of sunlight during the winter months. The cycles/day ratings are approximations. Ratings vary based on gate construction, installation, and temperature. Solar panels cannot be installed in areas that experience long periods of heavy fog, lake effect snow, or rain. 1 ZONE 1 (6 Hours of Sunlight/Day): Ideal for solar application 2 ZONE 2 (4 Hours of Sunlight/Day): Recommended for solar application 3 ZONE 3 (2 Hours of Sunlight/Day): Success of solar application will depend on type of gate operator and location of the solar panel NOT AVAILABLE NOT AVAILABLE 3 2 1 1 45