LiftMaster HDSL24UL Installation Manual - English - Page 48
Wire the Solar Panels and Batteries, Set the WALL XFMR/SOLAR switch to SOLAR.
View all LiftMaster HDSL24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 48 highlights
SOLAR PANELS Wire the Solar Panels and Batteries 24W min. - 60W max. for solar applications. NOTE: 33AH batteries are strongly recommended for optimal solar performance. 1. Connect (+) wire from solar panels to (+) pin on CHARGE IN connector on control board. 2. Connect (-) wire from solar panels to (-) pin on CHARGE IN connector on Control board. 3. Set the WALL XFMR/SOLAR switch to SOLAR. Red Wire Jumper Black Wire Red Wire Jumper Black Wire Red wire from battery harness 33AH, HD Gates K41-0102-000 33AH Batteries Black wire from battery harness 33AH, HD Gates K41-0102-000 7AH Batteries Set Switch to SOLAR Battery Wiring Control Board 20W APPLICATION IN SERIES 40W APPLICATION IN SERIES 60W APPLICATION IN SERIES 10W 10W 10W 10W 20W 20W 10W 10W 20W 20W 10W 10W 48 10W 10W 10W 10W 10W 10W