Panasonic FV08VS1 FV08VKL1 User Guide - Page 10

joists.Fig.

Page 10 highlights

INSTALLATION IV ( BETWEEN JOIST MOUNTING ) CONTINUED 3. Insert the fan body between joists. Make sure the fan body is level and square (perpendicular) with the joists.(Fig. 17) Keep the distance B (7/8 inch, 21.6mm) for the thickness of ceiling board. 4. Secure the suspension bracket to joists by using long screws(ST4.2X20) (Fig. 18, Fig. 19) Joists Fan body Junction box Adaptor 13 1/4-153/4 ( 336-400 ) A 16 1/2-183/4 (419-480) 3-5 ( 76-126 ) 5 4/5-7 4/5 ( 48-198) inches(mm) 7/8 (21.6) Fig. 17 5. Secure the suspension bracket to fan body by using screw II (ST4.2X12) (Fig. 19) 2 Long screws (ST4.2X20) Joist Fig. 18 2 Screw II 4 Long screws(ST4.2X20) (ST4.2X12) 6. Follow step 5 to 11 of installation I (page 6-page 7) to complete the installation work. 0 0 0 Joist Fig. 19 INSTALLATION V ( WOODEN HEADER ) 1. Before installation, secure the fan body to adaptor by using thumb screw (Fig. 13 of page 9). Secure the lighting unit to fan body (refering to Fig. 6 of page 7). 2. Install header between joists by using nails or screws. Joist , o '276 Fan body inches (mm) 3. Install the fan body and secure it by using long screws(ST4.2X20) (Fig. 20, Fig. 21) Adaptor Header , 4314 '(375) Joist Adaptor Fig. 20 Duct 4. Follow step 5 to 11 of installation I (page 6-page 7) to complete the installation work. 10 53 6 Long screws (ST4.2X20) Joist Fig. 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

INSTALLATION
IV
(
BETWEEN
JOIST
MOUNTING
)
CONTINUED
3.
Insert
the
fan
body
between
joists.
Make
sure
the
fan
body
is
level
and
square
(perpendicular)
with
the
joists.(Fig.
17)
Keep
the
distance
B
(7/8
inch,
21.6mm)
for
the
thickness
of
ceiling
board.
4.
Secure
the
suspension
bracket
to
joists
by
using
long
screws(ST4.2X20)
(Fig.
18,
Fig.
19)
5.
Secure
the
suspension
bracket
to
fan
body
by
using
screw
II
(ST4.2X12)
(Fig.
19)
6.
Follow
step
5
to
11
of
installation
I
(page
6
-page
7)
to
complete
the
installation
work.
Fan
body
Junction
box
Joists
Adaptor
13
1/4-153/4
(
336-400
)
A
16
1/2-183/4
(419-480)
3-5
(
76-126
)
5
4/5-7
4/5
(
48-198)
inches(mm)
7/8
(21.6)
Fig.
17
2
Long
screws
(ST4.2X20)
Joist
Fig.
18
2
Screw
II
4
Long
screws(ST4.2X20)
(ST4.2X12)
0
0
0
Joist
Fig.
19
INSTALLATION
V
(
WOODEN
HEADER
)
1.
Before
installation,
secure
the
fan
body
to
adaptor
by
using
thumb
screw
(Fig.
13
of
page
9).
Secure
the
lighting
unit
to
fan
body
(refering
to
Fig.
6
of
page
7).
2.
Install
header
between
joists
by
using
nails
or
screws.
3.
Install
the
fan
body
and
secure
it
by
using
long
screws(ST4.2X20)
(Fig.
20,
Fig.
21)
4.
Follow
step
5
to
11
of
installation
I
(page
6
-page
7)
to
complete
the
installation
work.
10
Joist
,
o
‘276
Fan
body
inches
(mm)
Header
,
43
14
'
(375)
Adaptor
Joist
Fig.
20
Adaptor
53
6
Long
screws
(ST4.2X20)
Duct
Joist
Fig.
21