Panasonic FV08VS1 FV08VKL1 User Guide - Page 7

screwsST4.2X20

Page 7 highlights

INSTALLATION I (JOIST MOUNTING-I) CONTINUED 8. Finish ceiling work. Ceiling hole should be aligned with the edge of the flange. (Fig. 6) 10 Is 71. 7' Ceiling 9. Insert the plug connector II and plug connector III into the receptacle II and receptacle M respectively, and secure the lighting unit to the fan body with 2 screw III (ST4.2X16) and 1 machine screw (M4X8). (Fig. 6) 10. Insert the fluorescent lamps and screw the night lamp into the lighting unit. (Fig. 6) Plug connector II Plug connector M Machine screw (M4X8) g A Lighting unit 2 Screw M (ST4.2X16) Plug connector IQ Plug connector II 11. Insert mouting springs into slots as shown and mount grille to fan body.(Fig. 7) Receptacle II Receptacle III Fluorescent lamps 4 W Night Lamp inches (mm) Fig. 6 Slot Lighting unit Mounting spring Ceiling Grille Fig. 7 INSTALLATION II (JOIST MOUNTING-II) 1. Disconnect plug connector from receptacle and remove adaptor from fan body before starting installation. 2. Insert the suspension bracket into the adaptor and secure it to joists by using long screws(ST4.2X20) (Fig. 8) Keep the distance B (7/8 inch, 21.6mm) for the thickness of ceiling board. If spacing A between joists is 21 1/4 to 23 1/2 inches (540 to 597mm), connect suspension bracket 11 and M(C4 mark to C4 mark) according to page 5. Select the suspension bracket according to spacing A as shown below. Spacing A between Joists 13 1/4-15 1/2 inches (mm) (336-394) suspension suspension bracket bracket I 16 1/2-18 3/4 (419-480) suspension bracket III 21 1/4-23 1/2 (540-597) suspension bracket 11 & III Adaptor 2 Long screws (ST4.2X20) Joists 2 Long screws (ST4.2X20) Suspension bracket 13 1/4-15 1/2 ( 336-394 ) 16 1/2-183/4 (419-480) 21 1/4-23 1/2 ( 540-597 ) A 3. Follow step 5 to 7 of the installation I (page 6) to complete the duct work and wiring. inches (mm) 7/8 (21.6) 7 11 Adaptor Fig. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

INSTALLATION
I
(JOIST
MOUNTING
-I)
CONTINUED
8.
Finish
ceiling
work.
Ceiling
hole
should
be
aligned
with
the
edge
of
the
flange.
(Fig.
6)
9.
Insert
the
plug
connector
II
and
plug
connector
III
into
the
receptacle
II
and
receptacle
M
respectively,
and
secure
the
lighting
unit
to
the
fan
body
with
2
screw
III
(ST4.2X16)
and
1
machine
screw
(M4X8).
(Fig.
6)
10.
Insert
the
fluorescent
lamps
and
screw
the
night
lamp
into
the
lighting
unit.
(Fig.
6)
11.
Insert
mouting
springs
into
slots
as
shown
and
mount
grille
to
fan
body.(Fig.
7)
1
0
Is
7.
1
Machine
screw
(M4X8)
7'
g
A
Lighting
unit
2
Screw
M
(ST4.2X16)
Ceiling
Plug
connector
II
Plug
connector
M
Plug
connector
IQ
Plug
connector
II
Fluorescent
lamps
4
W
Night
Lamp
inches
(mm)
Receptacle
II
Receptacle
III
Fig.
6
Slot
Lighting
unit
Mounting
spring
Grille
Ceiling
Fig.
7
INSTALLATION
II
(JOIST
MOUNTING
-II)
1.
Disconnect
plug
connector
from
receptacle
and
remove
adaptor
from
fan
body
before
starting
installation.
2.
Insert
the
suspension
bracket
into
the
adaptor
and
secure
it
to
joists
by
using
long
screws(ST4.2X20)
(Fig.
8)
Keep
the
distance
B
(7/8
inch,
21.6mm)
for
the
thickness
of
ceiling
board.
If
spacing
A
between
joists
is
21
1/4
to
23
1/2
inches
(540
to
597mm),
connect
suspension
bracket
11
and
M(C4
mark
to
C4
mark)
according
to
page
5.
Select
the
suspension
bracket
according
to
spacing
A
as
shown
below.
Spacing
A
between
Joists
inches
(mm)
13
1/4-15
1/2
(336-394)
16
1/2-18
3/4
(419-480)
21
1/4-23
1/2
(540-597)
suspension
bracket
suspension
bracket
I
suspension
bracket
III
suspension
bracket
11
&
III
3.
Follow
step
5
to
7
of
the
installation
I
(page
6)
to
complete
the
duct
work
and
wiring.
7
Adaptor
2
Long
screws
(ST4.2X20)
2
Long
screws
(ST4.2X20)
Joists
Suspension
13
1/4-15
1/2
(
336-394
)
bracket
16
1/2-183/4
(419-480)
21
1/4-23
1/2
(
540-597
)
A
inches
(mm)
7/8
(21.6)
Adaptor
1
1
Fig.
8