Panasonic FV08VS1 FV08VKL1 User Guide - Page 7
screwsST4.2X20
View all Panasonic FV08VS1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
INSTALLATION I (JOIST MOUNTING-I) CONTINUED 8. Finish ceiling work. Ceiling hole should be aligned with the edge of the flange. (Fig. 6) 10 Is 71. 7' Ceiling 9. Insert the plug connector II and plug connector III into the receptacle II and receptacle M respectively, and secure the lighting unit to the fan body with 2 screw III (ST4.2X16) and 1 machine screw (M4X8). (Fig. 6) 10. Insert the fluorescent lamps and screw the night lamp into the lighting unit. (Fig. 6) Plug connector II Plug connector M Machine screw (M4X8) g A Lighting unit 2 Screw M (ST4.2X16) Plug connector IQ Plug connector II 11. Insert mouting springs into slots as shown and mount grille to fan body.(Fig. 7) Receptacle II Receptacle III Fluorescent lamps 4 W Night Lamp inches (mm) Fig. 6 Slot Lighting unit Mounting spring Ceiling Grille Fig. 7 INSTALLATION II (JOIST MOUNTING-II) 1. Disconnect plug connector from receptacle and remove adaptor from fan body before starting installation. 2. Insert the suspension bracket into the adaptor and secure it to joists by using long screws(ST4.2X20) (Fig. 8) Keep the distance B (7/8 inch, 21.6mm) for the thickness of ceiling board. If spacing A between joists is 21 1/4 to 23 1/2 inches (540 to 597mm), connect suspension bracket 11 and M(C4 mark to C4 mark) according to page 5. Select the suspension bracket according to spacing A as shown below. Spacing A between Joists 13 1/4-15 1/2 inches (mm) (336-394) suspension suspension bracket bracket I 16 1/2-18 3/4 (419-480) suspension bracket III 21 1/4-23 1/2 (540-597) suspension bracket 11 & III Adaptor 2 Long screws (ST4.2X20) Joists 2 Long screws (ST4.2X20) Suspension bracket 13 1/4-15 1/2 ( 336-394 ) 16 1/2-183/4 (419-480) 21 1/4-23 1/2 ( 540-597 ) A 3. Follow step 5 to 7 of the installation I (page 6) to complete the duct work and wiring. inches (mm) 7/8 (21.6) 7 11 Adaptor Fig. 8