Panasonic fv05vf2 FV05VK1 User Guide - Page 11
Installation, Existing, Construction, Maintenance
View all Panasonic fv05vf2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION VI (IN EXISTING CONSTRUCTION) 1. Installation in existing construction. Installing the fan body in an existing building requires an accessible area (attic or crawl space) above the planning installation location or existing ducting and wiring. (1) To install the fan body, follow the procedures described in Installation II. Take the following precautions before installation. CAUTION: Check area above planning installation location to be sure that: 1. Duct work can be done and that area is sufficient for proper ventilation. 2. Wiring can be run to planning location. 3. No wiring or other obstructions shall interfere with installation. (2) Inspect duct work and wiring before proceeding with installation. (3) Plan suitable location for fan body.(next to ceiling joist) (4) Before installation, provide inspection and maintenance access at a location that will not interfere with installation work shown in installation II. (5) First, remove ceiling section. (6) Install fan body. 2. Installation from accessible area above fan location. (1) Inspect duct work and wiring before proceeding with installation. (2) Remove ceiling section. (3) Install fan body. MAINTENANCE WARNING: Disconnect power source before working on unit. Routine maintenance must be done every year. CAUTION: 1. Never use gasoline, benzene, thinner or any other such chemicals for cleaning the ventilating fan. 2. Do not damp water to motor. 3. Do not soak resin parts in water over 60°C. 1. Remove grille. (Squeeze mounting spring and pull down carefully.) (Fig. 22) Gloves Grille Slot Mounting spring Fig. 22 2. Wash and clean grille.(Use non-abrasive kitchen detergent, wipe dry with new cloth.) (Fig. 23) III Grille 11 Fig. 23