Samsung NE58K9850WS/AA Installation Guide - Page 14
Installing a 3-wire conduit
View all Samsung NE58K9850WS/AA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Installing a 3-wire conduit • Aluminum building wire may be used but it must be rated for the correct amperage and voltage. Connect the wires as described below. • The wire you use, the location and enclosure of splices, etc., must conform to good wiring practices and local codes. 1. Loosen the 3 lower terminal screws from the terminal block. Neutral terminal White 2. Insert the center bare wire (white/ Black neutral) tip through the bottom center terminal block opening. On certain models, the wire will need to be inserted through the ground Live 1 strap opening and then into the bottom center block opening. 3. Insert the two side bare wire tips into the lower left and the lower right terminal block openings. 4. Tighten the screws until the wire is firmly secured (35 to 50 inch-lbs.). Do not over-tighten the screws since it could damage the wires. Black White Wire tips 5. Go to Step 5 on page 15 to continue with the installation. Ground strap Red Live 2 Red CAUTION CAUTION You must check voltage after connecting power cord. Live 1 - Neutral Live 2 - Neutral Live 1 - Live 2 120 V 120 V 208 V / 240 V English - 14