Thermador VCIB54JP Installation Instructions - Page 20
Preparing, Housing Framework
View all Thermador VCIB54JP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Preparing VCINxxJP Housing Framework The unit must be mounted to the surrounding housing. See "Installation Preparation" on page 6 for suggestions on determining hood height. When calculating the load for the housing support system, be sure to include the weight of the ventilation unit. See Table 3 on page 6 for unit weight by model. Build housing in accordance with the dimensions noted in Figure 20 thru Figure 24. Model A VCIN36JP VCIN48JP VCIN54JP 14 3/16" (360 mm) 19 13/16" (503 mm) 22 13/16" (579 mm) Back of Trim Back of Hood 17/8" (47mm) 23" (584mm) 11/8" (29mm) 3 3/16" (81mm) A 77/8 " (200mm) 10¼" (260mm) 23/8" (86mm) 17/8 " (48mm) Diameter clearance holes for 1" (25.4mm) conduit to junction box Figure 20: Transition and Conduit Cutout Dimensions English 18