Vizio XMF1000 Quick Installation Guide - Page 8
Use Bottom Hole
View all Vizio XMF1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
5. Remove the bar, the leveler, and the unattached bracket (part A) from the wall. Using the power drill and the 7/32" drill bit, drill into the pencil mark as shown. Ensure you are drilling into the stud. Drill the hole about 2" into the stud. 7/32" 5 Pencil Mark 6. Remove 1 lag bolt and 1 washer from the pouch labeled LAG. 6 Place the other bracket (part A) against the wall as shown, and use a wrench to insert the lag bolt and washer into the hole you just drilled. Do not insert the lag bolts completely. Leave 1/2" of the bolt showing. Use Bottom Hole 6
5. Remove the bar, the leveler, and the unattached bracket (
part A
)
from the wall.
Using the power drill and the 7/32” drill bit, drill into the pencil
mark as shown.
Ensure you are drilling into the stud.
Drill
the hole about 2” into the stud.
6. Remove
1 lag bolt
and
1 washer
from the pouch labeled
LAG
.
Place the other bracket (
part
A
) against the wall as shown, and
use a wrench to insert the lag bolt and washer into the hole you
just drilled. Do not insert the lag bolts completely. Leave 1/2” of
the bolt showing.
5
7/32”
Pencil Mark
6
6
Use Bottom Hole