Vizio XMF1000 Quick Installation Guide - Page 9

Tighten Bolts

Page 9 highlights

7. Push the bar through the openings in each bracket (part A) as shown. Snap on the leveler (part E) and verify that the bar is level. Make any small adjustments, then use a wrench to tighten the 2 lag bolts completely. The bar can be inserted from right to left or left to right, depending on the end of the bar to which you would like the handle attached. 8. Using the power drill and the 7/32" drill bit, drill into the top 2 holes as shown. Ensure you are drilling into the stud. Drill the hole about 2" into the stud. 7 Level Bar Tighten Bolts 8 7/32" 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

7. Push the bar through the openings in each bracket (
part
A
) as
shown.
Snap on the leveler (
part E
) and verify that the bar is level.
Make any small adjustments, then use a wrench to tighten the 2
lag bolts completely.
8. Using the power drill and the 7/32” drill bit, drill into the top 2
holes as shown.
Ensure you are drilling into the stud.
Drill
the hole about 2” into the stud.
7
Level Bar
Tighten Bolts
8
7/32”
7
The bar can be inserted from right to left or left to right,
depending on the end of the bar to which you would like
the handle attached.