Brother International BAS-300G Instruction Manual - English - Page 75

Adjusting the work clamp lift amount

Page 75 highlights

10. STANDARD ADJUSTMENTS 10-15. Adjusting the work clamp lift amount The operation panel settings can be used to adjust the height to within 15 − 25 mm. (Refer to "5-7. Setting the work clamp lift amount.") The maximum lift amount for the work clamp is 30 mm above the top of the needle plate. Max. 30mm 5018Q 5019Q 1. Turn on the air, and depress the work clamp switch (1) to raise the work clamp (2). 2. Loosen the two bolts (4) of the work clamp arm lever (3), and move the work clamp arm lever (3) up or down to adjust. 10-16. Adjusting the air pressure (pneumatic work clamp specifications) Lift up the handle (2) of the regulator (1) and then turn it to adjust the air pressure to 0.5 MPa. After adjustment is complete, push the handle (2) downward to lock it. If water has collected in the bottle of the regulator (1), turn the drain cock (3) in the direction indicated by an arrow to drain the water. NOTE: Open the air cock (4) slowly. 1912B BAS-300G, BAS-311G, BAS-326G 66

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

10. STANDARD ADJUSTMENTS
BAS-300G, BAS-311G, BAS-326G
66
10-15. Adjusting the work clamp lift amount
<Motor-driven work clamp specifications>
The operation panel settings can be used to adjust the height to within 15
25 mm. (Refer to "5-7. Setting the work clamp lift
amount.")
<Pneumatic work clamp specifications>
The maximum lift amount for the work clamp is 30 mm above the top of the needle plate.
1. Turn on the air, and depress the work clamp switch (1) to raise the work clamp (2).
2. Loosen the two bolts (4) of the work clamp arm lever (3), and move the work clamp arm lever (3) up or down to adjust.
10-16. Adjusting the air pressure (pneumatic work clamp specifications)
Lift up the handle (2) of the regulator (1) and then turn it to
adjust the air pressure to 0.5 MPa.
After adjustment is complete, push the handle (2)
downward to lock it.
If water has collected in the bottle of the regulator (1), turn
the drain cock (3) in the direction indicated by an arrow to
drain the water.
NOTE:
Open the air cock (4) slowly.
5019Q
5018Q
1912B
Max. 30mm