Brother International BAS-342G PS Basic Instruction Manual - English - Page 12
INSTALLATION, 4-1. Removing the machine head fixing bolts [1], CAUTION
View all Brother International BAS-342G PS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
4. INSTALLATION 4. INSTALLATION CAUTION Machine installation should only be carried out by a qualified technician. Contact your Brother dealer or a qualified electrician for any electrical work that may need to be done. The sewing machine head weighs approximately 160 kg. Use equipment such as a crane or hoist when installing the machine head and adjusting the height of the table. If you try to lift the machine head yourself, it may cause injuries such as back injury. Do not connect the power cord until installation is complete. If the foot switch is depressed by mistake, the sewing machine might start operating and injury could result. If using a work table which has casters, the casters should be secured in such a way so that they cannot move. Use a table with a height of 84 cm or less. If the table is too high, the machine head may become unbalanced and fall down, and serious injury or damage to the sewing machine may result. Hold the machine head with both hands when tilting it back or returning it to its original position. In addition, do not subject the machine head to extra force while it is tilted back. If this is not observed, the machine head may become unbalanced and fall down, and serious injury or damage to the sewing machine may result. All cords should be secured at least 25 mm away from any moving parts. Furthermore, do not excessively bend the cords or secure them too firmly staples, otherwise there is the danger that fire or electric shocks could occur. Be sure to connect the ground. If the ground connection is not secure, you run a high risk of receiving a serious electric shock, and problems with correct operation may also occur. Install the safety covers to the machine head and motor. When placing the sewing machine on the table Carry out the procedure starting from "4-2. Installing the control box" on the next page. If the sewing machine was already installed to the table when it was delivered Carry out the procedures indicated by [1] to [15] in the titles in the order of the numbers. 4-1. Removing the machine head fixing bolts [1] If the sewing machine was already installed to the table when it was delivered, remove the two machine head fixing bolts (1) and the two plain washers (2). 2742B 4 BAS-342G PS