Brother International BAS-342G PS Basic Instruction Manual - English - Page 17
Installing the operation panel [3], INSTALLATION
![]() |
View all Brother International BAS-342G PS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
4-7. Installing the operation panel [3] 4. INSTALLATION (1) Cushion A (2) Operation panel base (3) Plain washers (medium) [3 pcs.] (4) Bolts [3 pcs.] (5) Cushions B [3 pcs.] (6) Plain washers (large) [3 pcs.] (7) Nuts [6 pcs.] * Tighten until the thickness of cushion B (5) is about 1 mm. (8) Rubber seat (9) Operation panel stand (10) Operation panel * Pass the cords of the operation panel (10) through the operation panel stand (9) and under the table. (11) Bolts [3 pcs.] (12) Bolt 3970M < If the sewing machine was already installed to the table when it was delivered > (1) Operation panel (2) Bolts [3 pcs.] * Pass the cords of the operation panel (1) through the operation panel stand (3) and under the table. 3971M BAS-342G PS 9
![](/manual_guide/products/brother-international-bas342g-ps-basic-instruction-manual-english-22b79dc/17.png)
4. INSTALLATION
9
BAS-342G PS
4-7. Installing the operation panel [3]
(1) Cushion A
(2) Operation panel base
(3) Plain washers (medium) [3 pcs.]
(4) Bolts [3 pcs.]
(5) Cushions B [3 pcs.]
(6) Plain washers (large) [3 pcs.]
(7) Nuts [6 pcs.]
* Tighten until the thickness of
cushion B (5) is about 1 mm.
(8) Rubber seat
(9) Operation panel stand
(10) Operation panel
* Pass the cords of the operation
panel (10) through the operation
panel stand (9) and under the
table.
(11) Bolts [3 pcs.]
(12) Bolt
< If the sewing machine was already installed to the table when it was delivered >
(1) Operation panel
(2) Bolts [3 pcs.]
* Pass the cords of the operation
panel (1) through the operation
panel stand (3) and under the
table.
3970M
3971M