Brother International BE-1201B-AC Instruction Manual - English - Page 184
Operating Procedures, 1-1 Power Source, 1-2 Preparation for Embroidering
View all Brother International BE-1201B-AC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 184 highlights
Chapter 7 Operation of Machine 1. Operating Procedures 1-1 Power Source Shut-off switch unit W1262Q 1. Turn the power on to the machine. 2. When the machine is equipped with the shut-off switch unit, Reset the emergency stop button. 3. When the machine is equipped with the shut-off switch unit, Press the power switch. 4. The power lamp lights up and a message is displayed on the LCD. BE-1201B-AC-PC Power switch Emergency stop switch W1606 BE-0901E-AC-PC W1604 W1605 • The alarm sounds three times and the presser foot move upward. Then the hoop moves to the zero point and the sewing data screen is displayed. Note) When turning the power off and back it on again, wait for at least 10 seconds. 1-2 Preparation for Embroidering 1. Select embroidering data while the machine is in the waiting state for an embroidering data selection, and transmit required data by pressing the icon. 2. The READY lamp lights up and the machine is placed in the waiting state. 3. Pressing , determine a position to start embroidering. An error code is displayed in the display window if a pattern comes out of the hoop. 4. Pressing starts embroidering. During embroidering, the speed is indicated in the display window. 5. After embroidering is finished, the machine is placed in the stand-by state. 7-2 BE-0901E-AC-PC• BE-1201B-AC-PC