Compaq ProLiant 800 ProLiant 800 Servers Supporting Pentium II Processors and - Page 28

Selecting a Site, Overview of Installing the ProLiant 800 Server

Page 28 highlights

2-2 Overview of Installing the ProLiant 800 Server 6. Turn on the server and insert the SmartStart and Support Software CD to configure. When the server boots from the SmartStart program, it automatically starts the System Configuration Utility. For SmartStart and Support Software CD initialization procedures, refer to the Server Setup and Management pack shipped with your server. 7. Install Compaq Insight Manager to manage the server. For Compaq Management CD initialization procedures, refer to the Server Setup and Management pack shipped with your server. 8. Register your server. For server registration information, refer to the Server Setup and Management pack shipped with your server. NOTE: When the server boots from the SmartStart program, the server automatically starts the System Configuration Utility. When the utility is completed, you will be prompted to turn the server off, install any ISA boards (any switch settings required will be provided by the System Configuration Utility), and then boot the server again from the SmartStart program. Selecting a Site Make sure that the installation site you select has the following features: s Sturdy, level installation site that includes dedicated and properly grounded circuits, air conditioning, and static electricity protection s 3-inch (7.6-cm) clearance at front and back of server for proper ventilation s Separate electrical circuit for the server WARNING: This equipment is designed for connection to a grounded AC outlet. The grounding type plug is an important safety feature. To reduce risk of electric shock or damage to your equipment, do not disable this feature. CAUTION: Make sure that the power outlet you plug your power cord into is easily accessible and is located as close to the equipment operator as possible. When you need to disconnect power from the equipment, be sure to unplug the power cord from the

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112

2-2
Overview of Installing the ProLiant 800 Server
6.
Turn on the server and insert the SmartStart and Support Software
CD to configure.
When the server boots from the SmartStart program, it
automatically starts the System Configuration Utility. For SmartStart and
Support Software CD initialization procedures, refer to the Server Setup
and Management pack shipped with your server.
7.
Install Compaq Insight Manager to manage the server.
For Compaq
Management CD initialization procedures, refer to the Server Setup and
Management pack shipped with your server.
8.
Register your server.
For server registration information, refer to the
Server Setup and Management pack shipped with your server.
NOTE
: When the server boots from the SmartStart program, the
server automatically starts the System Configuration Utility. When the
utility is completed, you will be prompted to turn the server off, install any
ISA boards (any switch settings required will be provided by the System
Configuration Utility), and then boot the server again from the SmartStart
program.
Selecting a Site
Make sure that the installation site you select has the following features:
Sturdy, level installation site that includes dedicated and properly
grounded circuits, air conditioning, and static electricity protection
3-inch (7.6-cm) clearance at front and back of server for proper ventilation
Separate electrical circuit for the server
WARNING:
This equipment is designed for
connection to a grounded AC outlet. The grounding
type plug is an important safety feature. To reduce risk
of electric shock or damage to your equipment, do not
disable this feature.
CAUTION:
Make sure that the power outlet you
plug your power cord into is easily accessible and is
located as close to the equipment operator as
possible. When you need to disconnect power from the
equipment, be sure to unplug the power cord from the