Craftsman 24594 Operation Manual - Page 5
nylock he× nut C. DO NOT TIGHTEN
View all Craftsman 24594 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
STEP 4: (SEE FIGURE 4) 10. Assemble a spacer (I), a 3/4" fiat washer (G), a wheel (air valve facing out) and another 3/4" fiat washer (G) onto the end of the axle that has both the large and small holes. 11. install a 3/8" × 1-1/2" cotter pin (E) into the small hole in the end of the axle. 12. Open the bail on the drive pin (J) and install it through the wheel and the large hole in the axle. Close the bail to lock the pin in place. (J) DRIVE PiN x (E) 1/8"× 1-1/2" X_ COTTER PiN STEP 6: (SEE FIGURE 6) 7. Turn the spreader upright on its wheels. 8. Assemble the flow control mounting tube to the hitch tube using two 5/16"x 1-3/4" he× bolts (A) and 5/16" nylock hex nuts (D). DO NOTTIGHTEN YET. FLOW CONTROL MOUNTING TUBE (A) 5/16" x 1-3/4" HEX BOLT FIGURE 4 (I) SPACER (G) 3/4" FLAT WASHER STEP 5: (SEE FIGURE 5) 9. Hook the double bent end of the flow control rod through the hole in the slide gate bracket located near the bottom of the hopper. HOPPER SLIDE GATE ) BRACKET FIGURE 5 FLOW CONTROL ROD Call 1-866-576-8388 for missing parts or assembly help DO NOT RETURN TO STORE FIGURE 6 STEP 7: (SEE FIGURE 7) 13. Assemble the two INNER hitch braces to flow control mounting tube using a 1/4" × 1-3/4" he× bolt (B) and a 1/4" nylock he× nut (C). DO NOT TIGHTEN YET. 14. TIGHTEN all nuts and bolts assembled up to this point. Do not collapse the tubes when tightening. (C) 1/4" NYLOC_ HEX HITCH BRACE INNER FLOW CONTROL IVIOUNTING TUBE FIGURE 7 \ HITCH BRACE iNNER 5