Cub Cadet 3X 26 inch TRAC Operation Manual - Page 10

Overhead Chute Control Flex Shaft w/ Steel, Chute & 2-Way Pitch Control

Page 10 highlights

ASSEMBLY 6. Insert chute control rod into pinion gear under handle panel. Make sure to line up hole in rod with arrow on pinion gear (Figure 18). Overhead Chute Control (Flex Shaft) w/ Steel Chute & 2-Way Pitch Control Steel Chute Assembly 2-Way Pitch Control Flex Shaft Figure 18 NOTE: Chute control rod will fit snug into pinion gear. Support rear of handle panel with one hand while inserting rod with your other hand to ensure rod is inserted all the way into pinion gear. NOTE: The hole in the chute control rod is a reference for aligning rod with indicator arrow on pinion gear, and will be visible after rod has been fully inserted. 7. Push chute control rod toward control panel until hole in rod lines up with hole in chute control input collar closest to chute control head and insert hairpin clip (a) removed in Step 1 (Figure 19). Figure 20 1. Remove lock nuts (a) and hex screws (b)from chute support bracket (this will require two wrenches) (Figure 21). Chute Control a Head a Figure 19 NOTE: Second hole is used to achieve further engagement of chute control rod into pinion gear, if required. Refer to Product Care section for Chute Control Rod adjustments. 8. Finish securing chute control head to chute support bracket with wing nut (b), clevis pin (d), and bow-tie cotter pin (e) removed in Step 1. STOP Continue to Set-Up (page 13). a Steel Chute Assembly Chute Base b b Chute Support Bracket Figure 21 2. Place steel chute assembly onto chute base and chute control head onto chute support bracket (Figure 21). 3. Secure chute control head to chute support bracket with lock nuts (a) and hex screws (b) removed in Step 1 (Figure 22). a a bb Figure 22 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

10
ASSEMBLY
6.
Insert chute control rod into pinion gear under handle panel.
Make sure to line up hole in rod with arrow on pinion gear
(Figure 18).
Figure 18
NOTE:
Chute control rod will fit snug into pinion gear.
Support rear of handle panel with one hand while inserting
rod with your other hand to ensure rod is inserted
all the
way
into pinion gear.
NOTE:
The hole in the chute control rod is a reference for
aligning rod with indicator arrow on pinion gear, and will be
visible after rod has been fully inserted.
7.
Push chute control rod toward control panel until hole in
rod lines up with hole in chute control input collar closest to
chute control head
and insert hairpin clip (a) removed in Step
1 (Figure 19).
a
Figure 19
NOTE:
Second hole is used to achieve further engagement
of chute control rod into pinion gear, if required. Refer to
Product Care section for Chute Control Rod adjustments.
8.
Finish securing chute control head to chute support bracket
with wing nut (b), clevis pin (d), and bow-tie cotter pin (e)
removed in Step 1.
STOP
Continue to Set-Up (page 13).
Overhead Chute Control (Flex Shaft) w/ Steel
Chute & 2-Way Pitch Control
Steel Chute Assembly
Flex Shaft
2-Way Pitch
Control
Figure 20
1.
Remove lock nuts (a) and hex screws (b)from chute support
bracket (this will require two wrenches) (Figure 21).
Steel Chute
Assembly
Chute Base
Chute Support Bracket
Chute Control
Head
a
a
b
b
Figure 21
2.
Place steel chute assembly onto chute base and chute control
head onto chute support bracket (Figure 21).
3.
Secure chute control head to chute support bracket with lock
nuts (a) and hex screws (b) removed in Step 1 (Figure 22).
a
a
b
b
Figure 22