D-Link DGS-3120-48PC Hardware Installation Guide - Page 23
Connect to a Redundant Power Supply, Connecting the DGS-3120-24TC to the DPS-200, CAUTION
View all D-Link DGS-3120-48PC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
xStack® DGS-3120 Series Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide Connect to a Redundant Power Supply The DPS-200 or DPS-500 is connected to the Master Switch using a 14-pin DC power cable. A standard, threepronged AC power cable connects the redundant power supply to the main power source. Figure 2- 6. Connecting the DGS-3120-24TC to the DPS-200 1. Insert one end of the 14-pin DC power cable into the receptacle on the switch and the other end into the redundant power supply. 2. Using a standard AC power cable, connect the redundant power supply to the main AC power source. A green LED on the front of the DPS-200 or DPS-500 will glow to indicate a successful connection. 3. Re-connect the Switch to the AC power source. The LED indicator will show that a redundant power supply is now in operation. 4. No change in switch configuration is necessary for this installation. NOTE: See the RPS Quick Installation Guide for more information. CAUTION: DO NOT use the DGS-3120-24TC/24SC switch with any redundant power system other than the DPS-200. CAUTION: DO NOT use the DGS-3120-48TC switch with any redundant power system other than the DPS-500 and the DPS-500DC. CAUTION: DO NOT use the DGS-3120-24PC and the DGS-3120-48PC switch with any redundant power system other than the DPS-700. 15