Dell PowerConnect 8100 Deploying Dell PowerConnect 8100 and Cisco Catalyst Swi - Page 4
Introduction, Dell PowerConnect 8132
View all Dell PowerConnect 8100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
Deploying the Dell PowerConnect 8100 with the Cisco Catalyst Introduction New demanding campus workloads are compelling Network administrators to take another look at the campus core/aggregation layers. The existing products like Cisco Catalyst 6500 platforms are aging and cannot support the new deployments. Network administrators are exploring options to either reposition the existing gear or replace it. Therefore, it is critical to understand how the newer campus aggregation/core platforms interoperate or replace the Cisco Catalyst switches. This document providesquick reference guidance in key areas for configuring or integrating the Dell PowerConnect 8100 series switches with the Cisco Catalyst 6500 series. The most critical aspects and differences with deploying VLAN (Virtual Local Area Networks) configuration, Link Aggregation, preferred configuration for Spanning Tree and addressing Cisco proprietary protocols are covered in this white paper. The Dell PowerConnect 8100 series switches include the Dell PowerConnect 8132 (Figure 1), PowerConnect 8132F (Figure 2), PowerConnect 8164 (Figure 3) and the PowerConnect 8164F (Figure 4). Note: For this document the Cisco Catalyst WS-C6504-E was used. Figure 1. Dell PowerConnect 8132 1 3 5 7 9 11 13 15 17 19 21 LNK 23 ACT Figure 2. 2 4 6 8 10 12 14 16 18 20 22 24 Dell PowerConnect 8132F 1 3 5 7 9 11 13 15 17 19 21 LNK 23 ACT Figure 3. 2 4 6 8 10 12 14 16 18 20 22 24 Dell PowerConnect 8164 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 LNK 47 ACT 2 4 6 8 Figure 4. 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 LNK ACT 1 LNK 2 ACT Dell PowerConnect 8164F 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 LNK 47 ACT 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 LNK ACT 1 LNK 2 ACT 4