Dell S4148F-ON Networking S4100-ON Series Set-Up Guide July 2017 - Page 10
Unpack, Rack or cabinet installation, Rack mount safety considerations, ReadyRails installation - configuration guide
![]() |
View all Dell S4148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
Unpack 1 Place the container on a clean, flat surface and cut all straps securing the container. 2 Open the container or remove the container top. 3 Carefully remove the switch from the container and place it on a secure and clean surface. 4 Remove all packing material. 5 Inspect the product and accessories for damage. Rack or cabinet installation You may either place the switch on a rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack. Rack mounting includes four-post, two-post, round threaded holes, or square holes. The Dell ReadyRails system is provided for 1U front-rack and two-post installations. The ReadyRails system includes two separately packaged rail assemblies. To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. WARNING: This guide is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. NOTE: The illustrations in this section are not intended to represent a specific switch. NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace. Rack mount safety considerations • Rack loading-Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack, then work to the top. Do not exceed your rack's load rating. • Power considerations-Connect only to the power source specified on the unit. When you install multiple electrical components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. • Elevated ambient temperature-If you install the switch in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 45°C maximum ambient temperature of the switch. • Reduced air flow-Do not compromise the amount of airflow required for safe operation of the equipment. Install the equipment in the rack so that the equipment constantly has the correct amount of airflow surrounding it. • Reliable earthing-Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: use of power strips. • Do not mount the equipment with the fan panel facing in the downward position. ReadyRails installation To easily configure your rack for installation of your S4100-ON Series system, use the ReadyRails rack mounting system provided. You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount. To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 10 S4100-ON Series installation
![](/manual_guide/products/dell-powerswitch-s4148fon-networking-s4100on-series-setup-guide-2017-8b330aa/10.png)