Dell S4148F-ON Networking S4100-ON Series Set-Up Guide July 2017 - Page 9
S4100–ON Series installation, Unpack the system
![]() |
View all Dell S4148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
3 S4100-ON Series installation To install the S4100-ON Series, Dell recommends completing the installation procedures in the order presented in this section. Always handle the S4100-ON Series switch and its components with care. Avoid dropping the system or any field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4100-ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this system. NOTE: For more information, see the Open Networking Hardware Diagnostic Guide. Topics: • Unpack the system • Unpack • Rack or cabinet installation • ReadyRails installation • 1U Tool-less mount installation • Two-post flush-mount installation • Two-post center-mount installation • Four-post threaded installation • S4100-ON Series system installation • 1U front-rack installation • Optics installation • Optics removal • System power-up • After system installation Unpack the system NOTE: Before unpacking the system, inspect the container and immediately report any evidence of damage. When unpacking the S4100-ON Series switch, make sure that the following items are included: • One S4100-ON Series switch • One RJ-45 to DB-9 female cable • Two sets of rail kits, no tools required • Two PSUs • Three or four fan units • Two country- and region-specific AC power cords • Dell Networking S4100-ON Series Setup Guide • Safety and Regulatory Information • Warranty and Support Information S4100-ON Series installation 9
![](/manual_guide/products/dell-powerswitch-s4148fon-networking-s4100on-series-setup-guide-2017-8b330aa/9.png)