Frigidaire AEQ6000ES Installation Instructions - Page 5
Unpacking, Acking - installation
UPC - 012505374906
View all Frigidaire AEQ6000ES manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
MOBILE HOME INSTALLATION 1. Dryer MUST be exhausted outside (outdoors, not beneath the mobile home) using metal ducting that will not support combustion. Metal ducting must be 4 inches (10.16 cm) in diameter with no obstructions. Rigid metal duct is preferred. 2. If dryer is exhausted through the floor and area beneath the mobile home is enclosed, the exhaust system MUST terminate outside the enclosure with the termination securely fastened to the mobile home structure. 3. When installing a gas dryer into a mobile home, a provision must be made for outside make up air. This provision is to be not less than twice the area of the dryer exhaust outlet. 4. This dryer MUST be fastened to the floor. Mobile Home Installation Kit No. 346764 is available from your dealer. 5. Refer to pages 2 and 3 for other important venting requirements. 6. Installation MUST conform to current Manufactured Home Construction & Safety Standard (which is a Federal Regulation Title 24 CFR-Part 32-80) or when such standard is not applicable, with American National Standard for Mobile Homes. The dryer is designed under ANSI Z 21.5.1 or ANSI/UL2158 - CAN/CSA C22.2 (latest editions) for HOME USE only. UNPACKING 1. Using a rug, blanket or a piece of cardboard packing to protect the floor, carefully lay the dryer on its left side and remove the foam shipping base. 2. Return the dryer to an upright position. FOAM SHIPPING PAD PACKING 5