Frigidaire FAK085R7V Installation Instructions (All Languages) - Page 5

Level platform assembly from side-to-side. - instalation

Page 5 highlights

4. Peel off protective backing from track seal. Apply seal to room side of window track. Center of seal strip should coincide with the line marked in Step 2. The two screw holes drilled in Step 3 should be directly above seal strip in the inner track. Apply track seal to window side of track. 5. Securely attach a siding-protection board to side of house. NOTE: Siding-protection board should be long enough to span 2 wall studs. Inside wall of house Siding-protection board 6. Place platform assembly, with platform tab against inside of window track, and attach it to window jamb. Use appropriate length screws (Items 9-11 in Preparing For Installation). 7. Adjust platform assembly so that outside edge is 3/16-inch lower than inside edge, as shown right. This ensures proper water drainage from the air conditioner. 8. Level platform assembly from side-to-side. Also, make sure window track is level. Use leveling shims as necessary to ensure unit is level from sideto-side. 9. Measure height of window opening from top of platform assembly as shown right. Subtract 20-5/8 inches. Mark this measurement on plastic window panel, along the longer side. (continued) Put platform tab against inside of track. Outside edge is 3/16-inch lower than inside. Measure distance and subtract 20 /5 8 inches. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

4. Peel off protective backing
from track seal. Apply
seal to room side of window track. Center of seal strip
should coincide with the line marked in Step 2. The
two screw holes drilled in Step 3 should be directly
above seal strip in the inner track.
5. Securely attach a siding-protection board
to
side of house.
NOTE:
Siding-protection board should be long
enough to span 2 wall studs.
6. Place platform assembly,
with platform tab
against inside of window track, and attach it to
window jamb. Use appropriate length screws (Items
9-11 in Preparing For Installation).
7. Adjust platform assembly
so that outside edge is
3/16-inch lower than inside edge, as shown right.
This ensures proper water drainage from the air
conditioner.
8. Level platform assembly from side-to-side.
Also, make sure window track is level. Use leveling
shims as necessary to ensure unit is level from side-
to-side.
9. Measure height of window opening
from top of
platform assembly as shown right. Subtract 20-5/8
inches. Mark this measurement on plastic window
panel, along the longer side. (continued)
Apply track seal
to window side
of track.
Inside
wall of
house
Siding-protection
board
Outside edge is 3/16-inch
lower than inside.
Put platform
tab against
inside of
track.
5
Measure
distance and
subtract
5
20 / inches.
8