Fujitsu XG0448 Hardware Guide - Page 31

Installation, 2.2.1 Installation of the Switch

Page 31 highlights

XG0448 Hardware Guide 2.2 Installation This section describes how to install the switch. Chapter 2 Installation 2.2.1 Installation of the Switch The following describes how to install. Installation on 19" Rack The switch can be installed and operated in the EIA standard 19" rack. Prepare the following rack mounting components attached. • Rack Mounting Brackets (Qty 2) • M3 Countersunk Screws (Qty 8) Reference "1.1.1 Parts List" (pg.18) Precautions • Do not put rubber foots on when installing on the rack. • Please set the switch (product) to a place near the electrical outlet which the power cable will be connected and secure a space for the power cable to be pulled off easily. • When installing the switch in the rack, separately procure screws according to the specifications of the rack. • Pay attention to control temperature inside and outside of the rack so that guaranteed operating temperature can be maintained properly for the switch. • Reserve certain space for air cooling in accordance with the cooling structure of the switch. • Check if power supply capacity (Rated Current) is sufficient from the power supply equipment such as power strip, service outlet from other devices or rack. • When rack mounted devices with multiple power cables are connected to one single service outlet, or multiple rack mounted devices with single power cable are connected to one single service outlet, there's a risk that total ground leakage current may exceed the power specifications. Pay special attention to the ground leakage current. Installation procedure is described below. 1. Place the switch on the flat place. 31 Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49

XG0448 Hardware Guide
Chapter 2 Installation
Installation
31
2.2
Installation
This section describes how to install the switch.
2.2.1
Installation of the Switch
The following describes how to install.
Installation on 19” Rack
The switch can be installed and operated in the EIA standard 19” rack.
Prepare the following rack mounting components attached.
Rack Mounting Brackets (Qty 2)
M3 Countersunk Screws (Qty 8)
Precautions
Do not put rubber foots on when installing on the rack.
Please set the switch (product) to a place near the electrical outlet which the power cable will be connected and
secure a space for the power cable to be pulled off easily.
When installing the switch in the rack, separately procure screws according to the specifications of the rack.
Pay attention to control temperature inside and outside of the rack so that guaranteed operating temperature can be
maintained properly for the switch.
Reserve certain space for air cooling in accordance with the cooling structure of the switch.
Check if power supply capacity (Rated Current) is sufficient from the power supply equipment such as power strip,
service outlet from other devices or rack.
When rack mounted devices with multiple power cables are connected to one single service outlet, or multiple rack
mounted devices with single power cable are connected to one single service outlet, there’s a risk that total ground
leakage current may exceed the power specifications. Pay special attention to the ground leakage current.
Installation procedure is described below.
1.
Place the switch on the flat place.
Reference
"1.1.1 Parts List" (pg.18)