GE ASH06LL Owners Manual - Page 11
Window, Requirements, Storm, Prepare Air - dimensions
UPC - 084691170648
View all GE ASH06LL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Installation Instructions [] WINDOW REQUIREMENTS • These instructions are for a standard double-hung window. You will need to modify them for other types of windows. • All supporting parts must be secured to firm wood, masonry or metal. • The electrical outlet must be within reach of the power cord. • Follow the dimensions in the table and illustration for your model. Models ASR05 ASHO6 A 11 3/4" min. 13" rain. B 22"-36" 22"-36" I I 5_===8 t A B I- With accordion panels) !|r f [] PREPARE AIR CONDITIONER [] Remove the backing from the top mounting rail seal strip and attach it to the bottom of the top mounting rail. Cut to size. [] Install the top mounting rail with 3 or 4 type A screws (depending on the number of holes in the top mounting rail) from the outside of the case. Top mounting [] STORM WINDOW REQUIREMENTS A storm window frame will not allow the air conditioner to tilt toward the outside and will keep it from draining properly. To adjust for this, attach a piece of wood to the sill. WOOD PIECES - WIDTH: 2" LENGTH:Long enough to fit inside the window frame. THICKNESS: To determine the thickness, place a piece of wood on the sill to make it 1/2" higher than the top of the storm window frame or the vinyl frame. Attach securely with nails or screws provided by the installer. 1/2" higher than vinyl frame 1/2 _ higher than storm window frame Storm frame _ _ (on some windows) Sill Vinyl frame Bottom mounting [] Loosen the lower screw on each side of the case and hook a security bracket on each side. To allow for later adjustment, do not tighten the screws until you install the unit in the window. Security bracket Security bracket 11