GE ASM10AL Owners Manual - Page 15

Through-the-Wall, Installation, InstructionsmOptional

Page 15 highlights

Through-the-Wall Installation InstructionsmOptional The case may be installed through-the-wall in both existing and new construction. Read completely, then follow step-by-step. NOTE: Obtain all materials locally for mounting the air conditioner throughthe-wall. [] IMPORTANT Through-the-wall installation is not appropriate if any of the side or top louvers in the case will be obstructed by the wall. All side and top louvers in the case must project on the outdoor side of the wall. The room side of the case must project into the room far enough to maximize the balance of the unit. The case must be installed level from sideto-side and with a slight tilt from front to rear. Use a level; no more than a 1/2 bubble will be the correct case slant to the outside. Lintel angle is required to support bricks or blocks above opening. Flashing is required and should extend the length of the opening to ensure no inside cavity leakage occurs. [] Remove the air conditioner from the case. For specific instruction, refer to the Window Installation Instructions. [] Make certain that a wall receptacle is available close to the hole location or make arrangements to install a receptacle. ii i i ..... - i ..... - [] IMPORTANT (cont.) [] Secure with 14 wood screws anchored at least an inch into the wall support structure. NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion. [] FINISH THE WALL OPENING [] Caulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building. Lintel angle Cau k ng _ , 1,' (._--_Plasterhne ,, I i II I I :_': I]l;I I _1 IIT/' -(ifTrimdemorsldeiindg ) OUTSIDE / Air louvers (top and _ sides must project on the outdoor side of the wall) Wood filler and caulking (above and below the flashing) Flashing (Drip rail) INSIDE Bottom rail J Bottom rail [] Place the case in the wall opening and place wood support strips between the case bottom and the flashing on both sides of the bottom rail. They should be the same height as the bottom rail and the same length as the wall opening. Flashing (Drip rail) Wood support strips [] Place the air conditioner into the case. For specific instruction, refer to the Window Installation Instructions. 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

Through-the-Wall
Installation
InstructionsmOptional
The
case
may
be
installed
through-the-wall
in both
existing
and
new
construction.
Read
completely,
then
follow
step-by-step.
NOTE:
Obtain
all materials
locally
for
mounting
the
air conditioner
through-
the-wall.
[]
IMPORTANT
(cont.)
[]
Secure
with
14
wood
screws
anchored
at
least an inch
into the wall
support
structure.
NOTE:
Drill
pilot
holes,
if necessary,
for
proper
installation.
If the frame
is oversized,
use shims
to prevent
case
distortion.
[]
IMPORTANT
Through-the-wall
installation
is
not
appropriate
if any of the side or top
louvers
in the case will be obstructed
by the
wall.
All
side
and top
louvers
in the
case must
project
on the
outdoor
side of the
wall.
The room
side
of the
case must
project
into the
room
far enough
to maximize
the
balance
of the unit.
The case must
be installed
level from
side-
to-side
and with
a slight tilt from
front
to
rear. Use a level; no more than
a 1/2 bubble
will be the correct
case slant to the
outside.
Lintel angle
is required
to support
bricks or
blocks above
opening.
Flashing
is required
and should
extend
the
length
of the
opening
to
ensure
no inside
cavity
leakage
occurs.
[]
Remove
the
air conditioner
from
the
case.
For specific
instruction,
refer to the Window
Installation
Instructions.
[]
Make
certain
that
a wall
receptacle
is
available
close
to the hole
location
or make
arrangements
to install
a receptacle.
i
i
i
i
.....
-
i
.....
-
[]
Place the
case in the wall
opening
and
place wood
support
strips
between
the case
bottom
and the flashing
on both
sides
of the
bottom
rail.
They
should
be the same
height
as the bottom
rail and the
same
length
as
the wall
opening.
[]
FINISH
THE
WALL
OPENING
[]
Caulk
all four
sides
on the outdoor
side
of
the case to
prevent
moisture
from
getting
through
to the interior
wall.
Use of flashing
(drip
rail) will
further
prevent
water
from
dripping
inside
the wall
and
down
the
outside
of the
building.
Air
louvers
(top and
_
sides
must
project
on the
outdoor
side
of the
wall)
,
1,'
(._--_Plasterhne
,,
I
Lintel
angle
i
I
I
I I :_':
I]l;I
Cau k ng
_
I _1
T'
Trim
molding
II/ -(if
desi
red)
OUTSIDE
/
INSIDE
Bottom
rail
J
Wood
filler
and
caulking
(above
and
below
the
flashing)
Flashing
(Drip
rail)
Bottom
rail
Flashing
(Drip
rail)
Wood
support
strips
[]
Place the
air conditioner
into the case.
For specific
instruction,
refer
to the Window
Installation
Instructions.
15