GE JGP940SEKSS Installation Instructions - Page 7
iNstallatION iNstRUctIONs
UPC - 084691114437
View all GE JGP940SEKSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Installation Instructions 5 Check for Leaks Before testing for leaks, make sure all burner knobs are in the OFF position. After connecting the cooktop to gas, check system for leaks with a manometer. If a manometer is not available, turn the gas supply on to the cooktop and use a liquid leak detector at all joints and connections to check for leaks. Tighten all connections if necessary to prevent gas leakage in the cooktop or supply line. DO NOT USE OPEN FLAME TO CHECK FOR LEAKS! Disconnect the cooktop and its individual shut-off valve from the gas supply piping system during any pressure testing of that system at test pressures greater than 1/2 psig (3.5 kPa). Isolate the cooktop from the gas supply piping system by closing its individual shut-off valve during any pressure testing of the gas supply system at test pressures equal to or less than 1/2 psig (3.5 kPa). 6 INSTALLATION OVER BUILT-IN OVEN See built-in oven installation for complete installation instructions. 90° Elbow Cabinet Sides 5″ To Center of 2″ Dia. Hole From Countertop 2″ Dia. Hole (20 7/8″ from front of Countertop to Hole Center) 7