GE PSB1000NWW Installation Instructions - Page 5
Prepare The Opening - installation instructions
UPC - 084691188377
View all GE PSB1000NWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Installation Preparation PREPARE THE OPENING The Advantium 120 can be installed in combination with other GE appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium 120 Installation: Order a 27"-wide single oven cabinet or cut the opening in a wall to the dimensions shown. 27" 23-1/2" 25-1/8" 17-1/2" 36-3/4" Min. Construct Base Min. 3/8" Plywood Supported by 2 x 4 or 1 x 2 Runners all Four Sides • Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined installation. • Allow 1-1/4" case trim overlap at the top and 7/8" overlap on the bottom and each side of the opening. • Oven overlaps will conceal cut edges on all sides of the opening. When installed over a single oven or a warming drawer, allow at least 2" between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120 and the other appliance overlaps. Construct a solid oven floor of 3/8" min. thick plywood supported by 2 x 4 runners on all sides. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout. PREPARE THE OPENING (CONT.) Installation over a GE Warming Drawer: 27" 23-1/2" Construct Solid Bottom Min. 3/8" Plywood Supported 25-1/8" by 2 x 4 or 1 x 2 Runners all Four Sides 17-1/2" 9-1/4" 36-3/4" Min. 2" Min. Install 2 x 4 or 2 x 2 Runners or Solid Bottom. Must Support 100 lbs. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. 5