GE PSB1000NWW Installation Instructions - Page 6
Caution
UPC - 084691188377
View all GE PSB1000NWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Installation Preparation PREPARE THE OPENING (CONT.) Installation over a GE Oven: 27" 23-1/2" Construct Solid Bottom Min. 3/8" Plywood Supported by 2 x 4 or 1 x 2 25-1/8" Runners all Four Sides 17-1/2" 45-1/4" Min. 2" Min. Per Oven Requirement PREPARE THE OPENING (CONT.) Installation over a GE Oven and Warming Drawer: Construct Solid 27" 23-1/2" Bottom Min. 3/8" Plywood Supported by 2 x 4 or 1 x 2 Runners all Four 25-1/8" Sides 17-1/2" 45-1/4" 9-1/4" 2" Min. Per Oven Requirement 2" Min. *If you are replacing a GE electric double oven with the combined installation of an Advantium 120 and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2" minimum shown. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the 75-pound product, plus additional oven loads of up to 50 pounds or a total weight of 125 pounds. REMOVE THE PACKAGING • Lift the oven out of the carton. • Remove all packing material and tape. • Open the door and remove parts box. • Locate parts package containing mounting screws. 6