Gigabyte Sumo 4112 User Manual - Page 11

Application of Liquid Cooling System

Page 11 highlights

4-9 Installation of 2.5" Enclosure 4-9.1 Connect the 4-pin power cable to the 5.25" front device housing 4-pin power port. 4-9.2 Connect the SATA cable from the e-SATA side to the SATA port on the motherboard. 4-9.3 Insert the 2.5"HDD mobile enclosure into the 5.25" front device housing and push it until the 2.5"HDD mobile enclosure is firmly secured. 4-9.4 Press the eject button and remove the 2.5"HDD mobile enclosure from the 5.25" front device housing. 4-9.1 4-9.2 4-9.3 4-9.4 4-10 Application of DIY inter changeable LED lighting 4-10-1 Remove front panel following instruction in 1-3. 4-10-2 Detach the LED holder by simply squeeze the securing hook at top and bottom softly. 4-10-3 Unsecure the existing LED & separate the wire from LED holder from open gap, then reinstall blue light LED & wire. 4-10.2 4-10.3 4-11 Application of Security locks This chassis provides one security lock, including side panel lock. Insert the key and turn 90° to lock or unlock. 4-12 Application of Foot Support This chassis is supplied with foot supports for ensureing the caseing is firmly seated on the holding surface. Swivel these four feet 90° to change their position. when moving, or laying down the case, please swivel the foot support to the closed position to prevent bending the foot support. 4-13 Application of Liquid Cooling System This chassis fully supports GIGABYTE 3D Galaxy series liquid cooling system (also supports most of the liquid cooling systems currently available). While installing the liquid cooling system, please refer to it's manual in advance. English 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

4-9 Installation of 2.5” Enclosure
4-9.1
Connect the 4-pin power cable to the 5.25” front device housing 4-pin power port.
4-9.2
Connect the SATA cable from the e-SATA side to the SATA port on the motherboard.
4-9.3
Insert the 2.5”HDD mobile enclosure into the 5.25” front device housing and push it until the
2.5”HDD mobile enclosure is firmly secured.
4-9.4
Press the eject button and remove the 2.5”HDD mobile enclosure from the 5.25” front device
housing.
4-10 Application of DIY inter changeable LED lighting
4-10-1
Remove front panel following instruction in 1-3.
4-10-2
Detach the LED holder by simply squeeze the securing hook at top and bottom softly.
4-10-3
Unsecure the existing LED & separate the wire from LED holder from open gap, then
reinstall blue light LED & wire.
4-11 Application of Security locks
This chassis provides one security lock, including side panel lock. Insert the key and turn 90°
to lock or unlock.
4-12 Application of Foot Support
This chassis is supplied with foot supports for ensureing the caseing is firmly seated on the holding
surface. Swivel these four feet 90° to change their position.
4-13 Application of Liquid Cooling System
This chassis fully supports GIGABYTE 3D Galaxy series liquid cooling system (also supports most
of the liquid cooling systems currently available). While installing the liquid cooling system, please
refer to it’s manual in advance.
4-9.1
4-9.2
4-9.3
4-9.4
when moving, or laying down the case, please swivel the foot support to the closed position to prevent bending the foot
support.
4-10.2
4-10.3
11
English