Haier 3U19FS1ERA Service Manual - Page 68
Installation of air return duct, Air duct insulation
View all Haier 3U19FS1ERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 68 highlights
>_]]VbTZR\ _^UZdZ_^Vb 2. Installation of air return duct Use rivets to connect the air return duct to the air return inlet of the indoor unit. The other end connects to the air return shutter. as shown in Fig.2. air return shutter air return duct indoor unit rivet Fig2: Duct return connected 3. Air duct insulation Insulation layer is needed for air supply and return duct. First, paste a glue nail to the air duct, and then attach the insulation cotton that has a tinfoil layer and use the glue nail cover to fix. Finally, seal the air duct interface with tinfoil adhesive tape closely. as shown in Fig3. galvanized insulating board fabric tinfoil glue nail glue nail cover adhesive tape Fig3 Installing the suspension screw Use M8 or M10 suspension screws (4, prepared in the field) (when the suspension screw height exceeds 0.9 m, M10 size is the only choice). These screws shall be installed as follows with space adapting to air conditioner overall dimensions according to the original building structures. Wooden structure A square wood shall be supported by the beams and then set the suspension screws. Square wood Suspension screw Beam New concrete slab To set with embedded parts, foundation bolts etc. Knife embedded part Guide plate embedded part Iron reinforcement Foundation bolt Pipe suspension foundation bolt -67-