Hayward Aqua Rite AQ-RT-PRO prior to Oct 08 - Page 16
Installation - control panel
View all Hayward Aqua Rite manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
INSTALLATION Installation must be performed in accordance with Local and NEC codes. 120/240 VAC POWER AQUA RITEpro FROM FROM POOL SPA TO TO SPA POOL Preparing Pool/Spa Water Refer to page 1 for recommended chemical levels. The pool's chemistry must be balanced BEFORE activating the Aqua Rite Pro. NOTE: If the pool does not have new water, add 1 quart (1 liter) of metal remover and 1 quart (1 liter) of non-copper based algaecide to the pool, per manufacturer's instructions. This ensures a quick, troublefree transfer to the Aqua Rite Pro system. Mounting the Aqua Rite Pro Control The Aqua Rite Pro is contained in a raintight enclosure that is suitable for outdoor mounting. The control must be mounted a minimum of 5 ft. (1.5 meters) horizontal distance (or more, if local codes require) from the pool/spa. The control is designed to mount horizontally on a flat surface with the knockouts facing downward. Because the enclosure also acts as a heat sink (disperses heat from inside the box), it is important not to block the four sides of the control. Do not mount Aqua Rite Pro inside a panel or tight enclosed area. 13