HP BL2x220c HP ProLiant BL2x220c Generation 5 Server Blade User Guide - Page 14

Remove the server blade, Access the internal server components, Remove server B assembly

Page 14 highlights

After initiating a virtual power down command, be sure that both server A and server B are in standby mode by observing that the system power LEDs are amber. Remove the server blade To remove the component: 1. Identify the proper server blade. 2. Power down the server blade (on page 13). 3. Remove the server blade. 4. Place the server blade on a flat, level work surface. WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components to cool before touching them. CAUTION: To prevent damage to electrical components, properly ground the server blade before beginning any installation procedure. Improper grounding can cause ESD. Access the internal server components To access internal server components, remove server B assembly from server A assembly. WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components to cool before touching them. CAUTION: To prevent damage to electrical components, properly ground the server blade before beginning any installation procedure. Improper grounding can cause ESD. Remove server B assembly For access component identification, see "Access components (on page 11)." Operations 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92

Operations 14
After initiating a virtual power down command, be sure that both server A and server B are in standby
mode by observing that the system power LEDs are amber.
Remove the server blade
To remove the component:
1.
Identify the proper server blade.
2.
Power down the server blade (on page
13
).
3.
Remove the server blade.
4.
Place the server blade on a flat, level work surface.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server blade
before beginning any installation procedure. Improper grounding can cause ESD.
Access the internal server components
To access internal server components, remove server B assembly from server A assembly.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server blade
before beginning any installation procedure. Improper grounding can cause ESD.
Remove server B assembly
For access component identification, see "Access components (on page