HP Indigo ws4500 Packer Arm Installation - Page 18

Preparing the tubes, Installing the main tube

Page 18 highlights

Preparing the tubes Refer below for preparing the tubes. 1. Cut the 6 mm black tube (P/N 0890-2334) into three separate tubes, as follows: Table 2-1 Tube Name Length Main tube Short tube 55 mm 11 mm Engagement tube 120 mm 2. Install the tubes as follows: Table 2-2 Tube Name Length P/N Main tube 55 mm 0890-2334 Clamp tube 185 mm 0890-2170 Short tube Engagement tube Disengagement tube 11 mm 120 mm 140 mm 0890-2334 0890-2334 0890-2336 Color Black Black Black Black Clear Circumference 6 mm 4 mm 6 mm 6 mm 6 mm Installation Procedure See page 17 See page 18 See page 22 See page 23 See page 23 Installing the main tube Connect the main tube as shown. 16 Chapter 2 Procedures

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33

Preparing the tubes
Refer below for preparing the tubes.
1.
Cut the 6 mm black tube (P/N 0890-2334) into three separate tubes, as follows:
Table 2-1
Tube Name
Length
Main tube
55 mm
Short tube
11 mm
Engagement tube
120 mm
2.
Install the tubes as follows:
Table 2-2
Tube Name
Length
P/N
Color
Circumference
Installation Procedure
Main tube
55 mm
0890-2334
Black
6 mm
See page 17
Clamp tube
185 mm
0890-2170
Black
4 mm
See page 18
Short tube
11 mm
0890-2334
Black
6 mm
See page 22
Engagement tube
120 mm
0890-2334
Black
6 mm
See page 23
Disengagement tube
140 mm
0890-2336
Clear
6 mm
See page 23
Installing the main tube
Connect the main tube as shown.
16
Chapter 2
Procedures