HP Indigo ws4500 Packer Arm Installation - Page 3

Overview, Prerequisites, Estimated installation time, Special skills, Special jigs and tools

Page 3 highlights

1 Overview While the substrate is rewinding, the packer arm removes wrinkles and bubbles from the roll. The packer arm is optimized for think substrates (12-60 micron). Prerequisites None Estimated installation time 1 hour Special skills None Special jigs and tools None Parts list Refer below for the parts list. Kit contents Q5025C Overview 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33

Overview
1
While the substrate is rewinding, the packer arm removes wrinkles and bubbles from the roll.
The packer arm is optimized for think substrates (12-60 micron).
Prerequisites
None
Estimated installation time
1 hour
Special skills
None
Special jigs and tools
None
Parts list
Refer below for the parts list.
Kit contents
Q5025C
Overview
1