Pre-Installation Survey, Typical Installation Schedule

Page 176 highlights

Site Preparation Pre-Installation Survey Pre-Installation Survey This chapter provides a site survey information packet consisting of an information form and checklists to be used to evaluate a computer facility. The checklists information sheets and information forms should be filled out by the customer and a Hewlett-Packard representative. • "Pre-Installation Survey Content" on page 164 describes the contents of the site survey information packet. • "Typical Installation Schedule" on page 164 describes the proposed schedule of installation events. • "Site Inspection" on page 165 provides a sample pf the on-site inspection checklist. • "Delivery Survey" on page 168 provides the delivery or installation requirement forms. Pre-Installation Survey Content The site pre-installation survey information is designed to identify problems that might occur before, during, or after the installation of the system. It contains the following items: • Pre-installation checklists-Verify the customer site is ready for the equipment installation. • Pre-installation survey information sheets-List customer name, address, and corresponding Hewlett-Packard sales personnel. • Pre-installation survey information forms-List delivery information and special instructions. Typical Installation Schedule The following schedule lists the sequence of events for a typical system installation: • 60 days before installation - Floor plan design completed and mailed to Hewlett-Packard • 30 days before installation - Primary power and air conditioning installation completed - Telephone and data cables installed - Fire protection equipment installed - Major facility changes completed - Special delivery requirements defined - Site inspection survey completed - Delivery survey completed - Signed copy of the site inspection and delivery survey mailed to Hewlett-Packard - Site inspection and pre-delivery coordination meeting arranged with a Hewlett-Packard representative to review the inspection checklist and arrange an installation schedule. • 7 days before installation - Final check made with a Hewlett-Packard customer engineer to resolve any last-minute problems 164 Chapter 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332

Chapter 5
Site Preparation
Pre-Installation Survey
164
Pre-Installation Survey
This chapter provides a site survey information packet consisting of an information form and checklists to be
used to evaluate a computer facility. The checklists information sheets and information forms should be filled
out by the customer and a Hewlett-Packard representative.
“Pre-Installation Survey Content” on page 164 describes the contents of the site survey information
packet.
“Typical Installation Schedule” on page 164 describes the proposed schedule of installation events.
“Site Inspection” on page 165 provides a sample pf the on-site inspection checklist.
“Delivery Survey” on page 168 provides the delivery or installation requirement forms.
Pre-Installation Survey Content
The site pre-installation survey information is designed to identify problems that might occur before, during,
or after the installation of the system. It contains the following items:
Pre-installation checklists—Verify the customer site is ready for the equipment installation.
Pre-installation survey information sheets—List customer name, address, and corresponding
Hewlett-Packard sales personnel.
Pre-installation survey information forms—List delivery information and special instructions.
Typical Installation Schedule
The following schedule lists the sequence of events for a typical system installation:
60 days before installation
Floor plan design completed and mailed to Hewlett-Packard
30 days before installation
Primary power and air conditioning installation completed
Telephone and data cables installed
Fire protection equipment installed
Major facility changes completed
Special delivery requirements defined
Site inspection survey completed
Delivery survey completed
Signed copy of the site inspection and delivery survey mailed to Hewlett-Packard
Site inspection and pre-delivery coordination meeting arranged with a Hewlett-Packard
representative to review the inspection checklist and arrange an installation schedule.
7 days before installation
Final check made with a Hewlett-Packard customer engineer to resolve any last-minute problems