HP ProLiant DL185 HP Rack Rail Kit Installation Instructions (464164-001, Febr - Page 3

Secure the 2U server to the rack

Page 3 highlights

Figure 2 Insert the 1U server into the rack Figure 5 Secure the 1U server to the rack Figure 3 Insert the 2U server into the rack Figure 6 Secure the 2U server to the rack 5. Using the holes provided in the rear rack rails, install tie wraps and route external cable as required (Figure 7). Figure 4 CTO bracket location 4. Secure the server to the rack rails using thumbscrews on the server front bezel (step 4 in Figures 5, 6). Figure 7 Cable management with tie wraps 6. Connect all power cords. Page 3

  • 1
  • 2
  • 3

Figure 2 Insert the 1U server into the rack
Figure 3 Insert the 2U server into the rack
Figure 4 CTO bracket location
4.
Secure the server to the rack rails using thumbscrews on the server
front bezel (step 4 in Figures 5, 6).
Figure 5 Secure the 1U server to the rack
Figure 6 Secure the 2U server to the rack
5.
Using the holes provided in the rear rack rails, install tie wraps and
route external cable as required (Figure 7).
Figure 7 Cable management with tie wraps
6.
Connect all power cords.
Page 3