HP Scitex FB7500 Essential Health and Safety Instructions Rev.C - Page 10
RIP and Networking Requirements, Miscellaneous
View all HP Scitex FB7500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
RIP and Networking Requirements • RIP hardware • Network connection • Internet connection • Phone line for remote support • Call me @ HP preparations Miscellaneous • Distilled water for the UV cooler • All pre-installation preparations not specifically provided for in the sales contract. These may include the following: • Cost of building/modifications at the installation site, as applicable. • Booking the services of a specialist moving contractor (equipped with the required crane) to unload and move the equipment on the scheduled installation date. • All pre-installation work prior to delivery and installation of the system. • Final preparation and cleaning of the site prior to installation. • For better serviceability of the FB7600, a small 2-step ladder should be prepared, prior to installation, as shown below. Figure 1-1 2-Step Ladder 2-step ladder 2 HP Scitex Industrial Presses Essential Health and Safety Instructions