HP Visualize b1000 hp Visualize b1000 and c3000 workstations owner's guide (a4 - Page 41

Powering Up Your System,

Page 41 highlights

System Overview Powering Up Your System Powering Up Your System After you have connected the various parts of the computer-for details, see the B1000/C3000 Installation Sheet that came with your computer-you are ready to power up the system. At this point, there are two possibilities: • Your computer has been "ignited;" that is, the HP's Instant Ignition process has installed the operating system already. In this case, when you power up the computer, you will be presented with a series of questions asking you the machine's host name, IP address, subnet mask, and other basic configuration questions (see the section "Getting Required Information"). When these are answered, the CDE login screen will appear. • Your computer has not been "ignited;" that is, the HP's Instant Ignition process has not installed the operating system already. In this case, you will need to install the operating system from the CDs found in the HP-UX 10.20 Software for Workstations ACE media kit; for details, see the CD Booklet included with the CDs. Note that the CDs contain the HP-UX 10.20 operating system, as well as the June 1999 HP-UX 10.20 ACE bundles. The ACE bundles reside on the IPR media, and are also available from the following URL: http://www.software.hp.com/ACE When the operating system (HP-UX 10.20) and the HP-UX 10.20 ACE (June 1998) are both installed, you will need to answer the questions noted above for the ignited system. After the questions have been answered, the CDE login screen will appear. Once the CDE login screen appears, and you can log in as root-initially, there is no password. When you have logged in, you will be able to create other users' accounts and do whatever other configuration and installations you require to get the machine into its desired state. See the HP CDE Getting Started Guide and the User's Guide for instructions on typical tasks. Chapter 1 41

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246

Chapter 1
41
System Overview
Powering Up Your System
Powering Up Your System
After you have connected the various parts of the computer—for details,
see
the
B1000/C3000
Installation
Sheet
that
came
with
your
computer—you are ready to power up the system. At this point, there are
two possibilities:
Your computer has been “ignited;” that is, the HP’s Instant Ignition
process has installed the operating system already. In this case, when
you power up the computer, you will be presented with a series of
questions asking you the machine’s host name, IP address, subnet
mask,
and
other
basic
configuration
questions
(see
the
section
“Getting Required Information”). When these are answered, the CDE
login screen will appear.
Your computer has not been “ignited;” that is, the HP’s Instant
Ignition process has
not
installed the operating system already. In
this case, you will need to install the operating system from the CDs
found in the HP-UX 10.20 Software for Workstations ACE media kit;
for details, see the CD Booklet included with the CDs. Note that the
CDs contain the HP-UX 10.20 operating system, as well as the June
1999 HP-UX 10.20 ACE bundles. The ACE bundles reside on the IPR
media, and are also available from the following URL:
When the operating system (HP-UX 10.20) and the HP-UX 10.20
ACE (June 1998) are both installed, you will need to answer the
questions noted above for the ignited system. After the questions
have been answered, the CDE login screen will appear.
Once
the
CDE
login
screen
appears,
and
you
can
log
in
as
root
—initially, there is no password. When you have logged in, you will
be
able
to
create
other
users’
accounts
and
do
whatever
other
configuration and installations you require to get the machine into its
desired state. See the
HP CDE Getting Started Guide
and the
User’s
Guide
for instructions on typical tasks.