HP Xw9300 Fixed Rack Kit Installation - Page 7

Mount the Workstation in the Rack, Holding the workstation with both hands to support its weight

Page 7 highlights

Mount the Workstation in the Rack 1. Place the workstation on the rails and slide it into the rack: a. Holding the workstation with both hands to support its weight, set the workstation on the rails. b. After the workstation is securely seated on the rails, push the workstation to slide it all the way into the rack. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

7
Mount the Workstation in the Rack
1.
Place the workstation on the rails and slide it into the rack:
a.
Holding the workstation with both hands to support its weight, set the workstation on the rails.
b.
After the workstation is securely seated on the rails, push the workstation to slide it all the way
into the rack.