HP rp8400 Site Preparation Guide, Second Edition - HP rp8400 Server Series - Page 56

Delivery Survey,

Page 56 highlights

Pre-installation Survey Delivery Survey Delivery Survey The delivery survey form shown in Figure 4-1 on page 41 and Figure 4-2 on page 42 lists delivery or installation requirements. If any of the items on the list apply, enter the appropriate information in the areas provided on the form. Special instructions or recommendations should be entered on the special instructions or recommendations form. The following list gives examples of special instructions or issues: • Packaging restrictions at the facility, such as size and weight limitations • Special delivery procedures • Special equipment required for installation, such as tracking or hoists • What time the facility is available for installation (after the equipment is unloaded) 40 Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 4
Pre-installation Survey
Delivery Survey
40
Delivery Survey
The delivery survey form shown in Figure 4-1 on page 41 and Figure 4-2 on page 42 lists delivery or
installation requirements. If any of the items on the list apply, enter the appropriate information in the areas
provided on the form.
Special instructions or recommendations should be entered on the special instructions or recommendations
form. The following list gives examples of special instructions or issues:
Packaging restrictions at the facility, such as size and weight limitations
Special delivery procedures
Special equipment required for installation, such as tracking or hoists
What time the facility is available for installation (after the equipment is unloaded)