Hitachi NT65A3 Instruction Manual - Page 14
English - diagram
![]() |
UPC - 717709007895
View all Hitachi NT65A3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
English Ⅺ THE PUSH LEVER AND TRIGGER MUST MOVE SMOOTHLY. Trigger Push Lever Do not connect air hose (2) Adjust the air pressure to 70 psi (4.9 bar 5 kgf/cm2). Connect the air hose. Do not load any nails in the Nailer. Set the switching device to the upward position (SINGLE ACTUATION MECHANISM). (Set the switching device to the upward position completely as shown in the diagram. Otherwise, it will not operate properly.) Valve Bush Switching Device Upward position Ⅺ THE NAILER MUST NOT LEAK AIR. (3) Remove the finger from the trigger and press the push lever against the wood. Ⅺ THE NAILER MUST NOT OPERATE. Depress Push Lever Do not pull Trigger 14
![](/manual_guide/products/hitachi-nt65a3-instruction-manual-353c0e9/14.png)
English
14
²
THE PUSH LEVER AND TRIGGER
MUST MOVE SMOOTHLY.
(2)
Adjust the air pressure to 70 psi (4.9 bar
5 kgf/cm
2
).
Connect the air hose.
Do not load any nails in the Nailer.
Set the switching device to the upward position (SINGLE ACTUATION MECHANISM).
(Set the switching device to the upward position completely as shown in the diagram.
Otherwise, it will not operate properly.)
²
THE NAILER MUST NOT LEAK AIR.
(3)
Remove the finger from the trigger and press the push lever against the wood.
²
THE NAILER MUST NOT OPERATE.
Do not connect
air hose
Trigger
Push Lever
Valve Bush
Switching Device
Upward position
Depress Push Lever
Do not pull Trigger