Hotpoint HDA3500NWW Installation Instructions - Page 6
Installation Preparation-Hot Water Supply, CAUTION
UPC - 084691156185
View all Hotpoint HDA3500NWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Installation Preparation-Hot Water Supply PREPARE HOT WATER SUPPLY Hot Water Line • The line may enter from either side, rear, or floor within the shaded area shown in Figure F. • The line may pass through the same hole as the electrical cable and drain hose, or cut an additional 1-1/2" diameter hole to accommodate the water line. If a power cord with plug is used, the water line must not pass through the power cord hole. CAUTION The hot water supply line pressure must be at least 20 PSI. Lower pressures could cause the water valve to leak and cause water damage. 1-1/2" Dia. Shut-off Hole 5" 4" Valve Hot 2" From Cabinet 19" From Wall 5" 4" 6" Cabinet Face 2" From Floor Figure F 661Dia56 Water Line Connection • Turn off the water supply. • Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.) • The water connection is on the left side of the dishwasher. Install the hot water inlet line, using 3/8" or larger copper tubing. Route the line as shown in Figure F and extend forward at least 19" from rear wall. • Adjust the water heater to deliver water between 120°F and 150°F. • Flush water line to clean out debris. Use a bucket to catch water and debris. • The hot water supply line pressure must be between 20 and 120 PSI. 6