Hunter 82022 Owner's Manual - Page 8

New Construction - suspended between joists

Page 8 highlights

New Construction - suspended between joists B11 B12 F E Slide the mounting rails into brackets. 5/8 5/8 1/2 1/2 Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock. B13 B14 F 1/8" bit Mark position of screws by using holes as a template. Drill a hole in the center of each outline. B15 B16 Insert screws, leaving space between the screw head and the joist. Screws are not provided. 8 Attach the rails onto the screws. 42949-01 04/18/2007

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
New Construction – suspended between joists
8
B11
E
F
5/8
1/2
5/8
1/2
B12
1/8” bit
B14
B15
F
B13
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.
B16
42949-01
04/18/2007