IBM 86613RY Setup Guide - Page 10

Installing the NetBAY3 Tower Models Only

Page 10 highlights

1. Installing the NetBAY3 (Tower Models Only) The NetBAY3 is attached to the bottom of Netfinity 5500 M10 tower models. The bezel for the NetBAY3 is shipped, unattached, inside the NetBAY3. For more information, refer to the "NetBAY3" information in the "Hardware Information" section of this Server Library. 1 Locate the bezel inside the NetBAY3. 2 Remove and unpack the bezel. 3 Hook the tabs on the left side of the bezel around the posts on the server. 4 Gently push the right side of the bezel toward the server until the bezel locks into place. 5 Continue with "2. Installing Hot-Swap Hard Disk Drives" on page 7. 6 Netfinity 5500 M10 Express Setup and Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

1. Installing the NetBAY3 (Tower Models Only)
The NetBAY3 is attached to the bottom of Netfinity 5500 M10 tower models.
The
bezel for the NetBAY3 is shipped, unattached, inside the NetBAY3.
For more information, refer to the “NetBAY3” information in the “Hardware
Information” section of this
Server Library
.
1
Locate the bezel inside the NetBAY3.
2
Remove and unpack the bezel.
3
Hook the tabs on the left side of the bezel around the posts on the server.
4
Gently push the right side of the bezel toward the server until the bezel locks
into place.
5
Continue with “2. Installing Hot-Swap Hard Disk Drives” on page
7.
6
Netfinity 5500 M10 Express Setup and Installation