IBM SAN04B-R User Guide - Page 38

Installation, safety, considerations, Facility, requirements

Page 38 highlights

Installation and safety considerations Use this section to prepare your site for a safe and successful installation. The physical installation of the router must be completed by qualified service personnel. Attention: Read the "Safety and environmental notices" on page xv before attempting any installation, maintenance, or service procedures. Facility requirements To ensure correct operation of the router, the facility where the router is in use must meet the requirements listed in Table 4. Table 4. Facility requirements Type Thermal Cabinet (when rack-mounted) Requirements v A minimum air flow of 53 cubic meters per hour (31 cubic feet per minute) available in the immediate vicinity of the router v Ambient air temperature not exceeding 40°C (104°F) while the router is operating v A minimum of 5.1 cm (2 in.) airspace for air intake and exhaust vents v If cabinet mounted, install the router with the nonport side, which contains the air intake vents, facing the cool-air aisle. v Ensure that airflow and temperature requirements are met on an ongoing basis, particularly if the router is installed in a closed or multi-cabinet assembly. v A minimum of one EIA unit high in a 19-in. (48.3 cm.) cabinet. v Ground all equipment in the cabinet through a reliable branch circuit connection and maintain ground at all times. Do not rely on a secondary connection to a branch circuit, such as a power strip. v Verify that the additional weight of the router does not exceed the cabinet's weight limits or unbalance the cabinet in any way. v Cabinet must be secured to insure stability in case of unexpected movement, such as an earthquake. v Plan for cable routing and management before installing the chassis. See "Planning for cable management" on page 18 for more information. Allow at least 3U of space below the chassis if you will be routing cables under the chassis. 10 SAN04B-R Installation, Service, and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103

Installation
and
safety
considerations
Use
this
section
to
prepare
your
site
for
a
safe
and
successful
installation.
The
physical
installation
of
the
router
must
be
completed
by
qualified
service
personnel.
Attention:
Read
the
“Safety
and
environmental
notices”
on
page
xv
before
attempting
any
installation,
maintenance,
or
service
procedures.
Facility
requirements
To
ensure
correct
operation
of
the
router,
the
facility
where
the
router
is
in
use
must
meet
the
requirements
listed
in
Table
4.
Table
4.
Facility
requirements
Type
Requirements
Thermal
v
A
minimum
air
flow
of
53
cubic
meters
per
hour
(31
cubic
feet
per
minute)
available
in
the
immediate
vicinity
of
the
router
v
Ambient
air
temperature
not
exceeding
40°C
(104°F)
while
the
router
is
operating
v
A
minimum
of
5.1
cm
(2
in.)
airspace
for
air
intake
and
exhaust
vents
v
If
cabinet
mounted,
install
the
router
with
the
nonport
side,
which
contains
the
air
intake
vents,
facing
the
cool-air
aisle.
v
Ensure
that
airflow
and
temperature
requirements
are
met
on
an
ongoing
basis,
particularly
if
the
router
is
installed
in
a
closed
or
multi-cabinet
assembly.
Cabinet
(when
rack-mounted)
v
A
minimum
of
one
EIA
unit
high
in
a
19-in.
(48.3
cm.)
cabinet.
v
Ground
all
equipment
in
the
cabinet
through
a
reliable
branch
circuit
connection
and
maintain
ground
at
all
times.
Do
not
rely
on
a
secondary
connection
to
a
branch
circuit,
such
as
a
power
strip.
v
Verify
that
the
additional
weight
of
the
router
does
not
exceed
the
cabinet's
weight
limits
or
unbalance
the
cabinet
in
any
way.
v
Cabinet
must
be
secured
to
insure
stability
in
case
of
unexpected
movement,
such
as
an
earthquake.
v
Plan
for
cable
routing
and
management
before
installing
the
chassis.
See
“Planning
for
cable
management”
on
page
18
for
more
information.
Allow
at
least
3U
of
space
below
the
chassis
if
you
will
be
routing
cables
under
the
chassis.
10
SAN04B-R
Installation,
Service,
and
User’s
Guide