Intel SC5300AF2 User Guide - Page 12

Removing the Intel Management Module—Professional Edition - motherboard

Page 12 highlights

To prepare for the installation, you will need the following: • The utilities for your server board (available on the Intel® Server Deployment Toolkit CD shipped with your server board) • The latest FRU/SDR package, firmware update files, and Release Notes from http://support.intel.com/support/motherboards/server. To install the Professional Edition module, do the following: 1. Power down the system. 2. Remove AC power. 3. Open the chassis to gain access to the Intel Management Module Connector. 4. Insert the nylon standoff into the baseboard to support the Intel Management Module. Choose the hole farthest away from the strap after the Intel Management Module is inserted into the connector. 5. Align the Management Module over the baseboard connector and the nylon standoff. 6. Press down on the Management Module to fully seat the connector and standoff. 7. Close the chassis, reconnect the AC power, and power-on the system. 8. Update the firmware and FRU/SDR for your server board. Use the latest files and instructions for your server board that you downloaded from http://support.intel.com/support/motherboards/server. 9. Install ISM 8.20 from the ISM 8 Installation CD, or run the Intel® Server Configuration Wizard (SCW) from the Intel Server Deployment Toolkit CD to configure the new features on the Professional Edition module. Removing the Intel Management Module-Professional Edition To remove the Professional Edition module, do the following: 1. Power down the system. 2. Remove AC power. 3. Open the chassis to gain access to the Intel Management module. 4. Pinch the end of the standoff and slightly raise the Management Module to disengage the standoff. To avoid damage to the connector, do not lift the edge the board that is farthest from the connector (near the standoff). 5. Using the strap attached to the module, gently pull up to slightly disengage the end of the connector closest to the strap. Using your fingers, grasp the board near the other end of the connector and gently rock the board back and forth until the connector is completely disengaged. 6. Close the chassis and reconnect the AC power. 12 Intel® Management Module Installation and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

12
Intel® Management Module Installation and User’s Guide
To prepare for the installation, you will need the following:
The utilities for your server board (available on the Intel
®
Server Deployment Toolkit CD
shipped with your server board)
The latest FRU/SDR package, firmware update files, and Release Notes from
.
To install the Professional Edition module, do the following:
1.
Power down the system.
2.
Remove AC power.
3.
Open the chassis to gain access to the Intel Management Module Connector.
4.
Insert the nylon standoff into the baseboard to support the Intel Management Module.
Choose
the hole farthest away from the strap after the Intel Management Module is inserted into the
connector.
5.
Align the Management Module over the baseboard connector and the nylon standoff.
6.
Press down on the Management Module to fully seat the connector and standoff.
7.
Close the chassis, reconnect the AC power, and power-on the system.
8.
Update the firmware and FRU/SDR for your server board.
Use the latest files and instructions
for your server board that you downloaded from
.
9.
Install ISM 8.20 from the ISM 8 Installation CD, or run the Intel
®
Server Configuration Wizard
(SCW) from the Intel Server Deployment Toolkit CD to configure the new features on the
Professional Edition module.
Removing the Intel Management Module—Professional Edition
To remove the Professional Edition module, do the following:
1.
Power down the system.
2.
Remove AC power.
3.
Open the chassis to gain access to the Intel Management module.
4.
Pinch the end of the standoff and
slightly
raise the Management Module to disengage the
standoff. To avoid damage to the connector, do not lift the edge the board that is farthest from
the connector (near the standoff).
5.
Using the strap attached to the module, gently pull up to slightly disengage the end of the
connector closest to the strap.
Using your fingers, grasp the board near the other end of the
connector and gently rock the board back and forth until the connector is completely
disengaged.
6.
Close the chassis and reconnect the AC power.