Jenn-Air JMC3415ES Installation Instruction - Page 7

Install Rails and Bottom Duct

Page 7 highlights

IMPORTANT: The flanges of duct 5 go under duct 4. The front edge of the duct should be flush with the microwave oven itself and not the door. Correct Incorrect Install Rails and Bottom Duct 1. Make sure notch is at bottom of rail. Position the rail marked L on the left side of the cabinet with the bottom edge resting on the cabinet floor. Verify rail is flush with the face of the cabinet before proceeding. Drill pilot holes. Attach mounting rail using 4 #8-14 x Z\x" screws. NOTE: Drive screws in the center of the holes in the mounting rail. 3. Position bottom duct in cabinet so that each side of duct is the same distance from the side walls and spacers are flush with cabinet. A B Dimension A must equal Dimension B. Notches Left Rail Right Rail Mounting rail Spacers behind holes 4. Drill pilot holes for 2 holes on the front of the bottom duct. 2. Repeat Step 1 on right side of cabinet. Use the following chart and illustration to measure the distance between center of mounting rail holes. Use shims if measured distance is incorrect. 27" (68.6 CM) INSTALLATION 30" (76.2 CM) INSTALLATION 25Z\x" (64.8 cm) 28Z\x" (72.4 cm) A A. Pilot holes 5. Secure bottom duct to cabinet floor with 2 #8-14 x Z\x" screws on front of bottom duct. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

7
IMPORTANT:
The flanges of duct 5 go under duct 4. The front
edge of the duct should be flush with the microwave oven itself
and not the door.
Install Rails and Bottom Duct
1.
Make sure notch is at bottom of rail. Position the rail marked
L on the left side of the cabinet with the bottom edge resting
on the cabinet floor. Verify rail is flush with the face of the
cabinet before proceeding. Drill pilot holes. Attach mounting
rail using 4 #8-14 x
Z\x
" screws.
NOTE:
Drive screws in the center of the holes in the
mounting rail.
2.
Repeat Step 1 on right side of cabinet. Use the following
chart and illustration to measure the distance between center
of mounting rail holes. Use shims if measured distance is
incorrect.
27" (68.6 CM)
INSTALLATION
30" (76.2 CM)
INSTALLATION
25
Z\x
" (64.8 cm)
28
Z\x
" (72.4 cm)
Correct
Incorrect
Mounting rail
Right Rail
Left Rail
Notches
3.
Position bottom duct in cabinet so that each side of duct is
the same distance from the side walls and spacers are flush
with cabinet.
4.
Drill pilot holes for 2 holes on the front of the bottom duct.
5.
Secure bottom duct to cabinet floor with 2 #8-14 x
Z\x
"
screws on front of bottom duct.
A
Dimension A must equal Dimension B.
Spacers behind holes
A
B
A. Pilot holes